Location: Myersville, Maryland – completed by Frederick Fox team
Project Description:
Fox developed improvement plans for the construction of approximately 2,700 L.F. of 6” and 8” potable water distribution mains located in Myersville, Maryland. The facilities are located in an upscale residential development known as Saber Ridge. The development is served by a production well developed in order to supplement the existing water system operated by the Town of Myersville. The raw waterline located within the development area of Saber Ridge delivers ground water from the well to the water treatment plant. Water treatment is provided by the existing Town facility. The water booster pump station designed by McCrone, Inc. was integrated into the existing water treatment building and provides a pressure zone to serve the Saber Ridge development and surrounding residences.
Fox provided extensive project coordination/management with the Owner, McCrone, Inc., and Review Agencies throughout the design process to coordinate the site planning for the Booster Station as well as planning the utility sizes and connection locations. Both the Water Booster Station and the water system will be owned by the Town of Myersville.